Mumbai · BKC
BKC PRT Corridor
An 8.8 km elevated corridor with 22 stations and approximately 400 autonomous electric pods, connecting Bandra and Kurla through BKC.
The project targets over 100,000 daily riders by 2031, with operations planned from 2027.
Status: Concession signed in 2024; under construction.
Enquire